From an approved configuration to a cost you can trust
Today an engineer reviews every configuration against the catalog limits before it can be quoted, and prices come from your approved catalog. The next step is estimating the real cost of building and installing that lift, component by component, before anyone sets a price.
Planned capability. This module is not available yet, and nothing on this page is a screenshot of working software. Tell us how you would use it and we will factor that into what we build next.
Who it is for
- Estimators and engineering heads who price non-standard lifts
- Owners who want margins based on cost, not on last year's price list
The problem
Non-standard lifts are priced from memory or an old spreadsheet. The true cost of a longer travel, a special cabin or a difficult site only shows up after the order, when it is too late to change the price.
How it is planned to work
This describes the intended design. It is not built yet, and details may change.
- 1
Start from the approved configuration
The estimate would begin from the configuration engineering has already reviewed, so nobody retypes the specification.
- 2
Build the bill of materials
Components and quantities would come from rules in your catalog, with an estimator adding what the rules do not cover.
- 3
Add labour and site factors
Installation days, travel, scaffolding and civil support would be added from the survey.
- 4
Review before pricing
A second person would approve the estimate, and the quotation would show margin against it.
What already exists in the product
- Engineering review of each configuration against approved loads, speeds, dimensions and option rules (Elevator configurator)
- Cost and margin lines on quotations, visible only to permitted roles
- Survey dimensions checked against the configuration
Controls and records
- Estimates would follow the same rule as everything else: the person who prepares does not approve
Planned scope
None of this is available today:
- Bill of materials per configuration
- Component cost tables and supplier prices
- Labour and site-condition factors
- Estimate versus actual comparison after installation
Connected to
Questions
Can we estimate cost today?
Quotation lines can carry cost and show margin to the roles allowed to see it. A bill-of-materials estimate is not built yet.
When will it be ready?
It is on the roadmap without a date. We will not show a date until the work is scheduled.
