Find the pit and headroom problem before the order is signed
Most expensive surprises in an installation were visible on the day of the survey: a shallow pit, a short headroom, an unfinished shaft. OopsWeSold turns the survey into a structured record that engineering approves, and that every later step is checked against.
Engineering and quotations · Product tour
Site surveys, step by step in the real app
Screenshots from the working product, using a fictional demo company. Select any screen to open it full size.
1Every survey, with its status
Surveys by opportunity and customer, with revision number and status from draft to approved.
2Sectioned survey form
Site, shaft, machine room, power, civil readiness and requirements, each checked off as it is completed.
3Dimensions feed the checks
An approved survey is checked against the chosen lift model, and mismatches are shown before engineering approves.
How it helps
The same questions every time
Every surveyor fills the same sections, so engineering gets complete measurements.
Revisions are kept
Editing an approved survey starts a new revision; the approved one is never overwritten.
Photos with the measurements
Site photos and drawings are attached to the survey itself, not lost in a phone gallery.
Compared with how it is usually done
Spreadsheets, Tally and general ERPs are good tools for what they were built for. This is where each one fits for this part of a lift business.
| Task | Excel, paper and WhatsApp | Tally or a general ERP | OopsWeSold |
|---|---|---|---|
| Record shaft, pit and headroom | Paper form or sheet, photographed and sent on WhatsApp | No survey form; custom fields at best | Structured sections with required measurements |
| Engineering review | Phone call and a marked-up PDF | Not part of the product | Approve or return with a note, recorded with who and when |
| Check the shaft fits the lift | An engineer compares by hand | Not available | Survey checked against the model's approved limits |
Other elevator software
- Structured site survey with shaft, pit and headroom: claimed by 1 of the 7 elevator software websites we read.
Checked on 24 November 2026, from each vendor's own website. See the full comparison.
Who it is for
- Surveyors and site engineers
- Engineering managers who approve what gets quoted
- Sales teams who need a trustworthy basis for the quotation
The problem
Survey notes arrive as photos and messages. Measurements are retyped, and engineering finds out about a headroom problem after the customer has a price.
How it works
- 1
Assign
Sales assigns a surveyor to the opportunity.
- 2
Record
The surveyor completes sections for the site, shaft, machine room, power, civil readiness and the customer's requirements, with a completion meter. Photos and drawings attach to the survey.
- 3
Submit and review
Engineering approves the survey or sends it back with a reason. Changes after review create a new revision.
- 4
Use
An approved survey is the only basis for a configuration. Its measurements are checked live against the product limits.
Try it: check a surveyed shaft
Enter clear finished RCC/masonry shaft readings (after plastering) and compare them against approved Indian lift series limits. Sales cannot push an incompatible configuration past engineering.
Below bottom FFL · Model minimum: 1200 mm
Top FFL to hoistway slab soffit · Minimum: 3800 mm
Clear plumb width · Catalog GAD target: 1850 mm
Clear plumb depth · Catalog GAD target: 1650 mm
What you can do today
- Sectioned, mobile-friendly form with revisions
- Photo, drawing and document attachments
- Engineering review with approve or return
- Approved dimensions feed the configurator's checks
Controls and records
- Review decisions are audited
Not available yet
So there are no surprises:
- Offline survey capture on a phone
- Measurement import from laser devices
Connected to
Questions
Can the surveyor work without a connection?
Not yet. The survey is a web form that needs a connection.