Find the pit and headroom problem before the order is signed

Most expensive surprises in an installation were visible on the day of the survey: a shallow pit, a short headroom, an unfinished shaft. OopsWeSold turns the survey into a structured record that engineering approves, and that every later step is checked against.

Engineering and quotations · Product tour

Site surveys, step by step in the real app

Screenshots from the working product, using a fictional demo company. Select any screen to open it full size.

  1. Every survey, with its status: Surveys by opportunity and customer, with revision number and status from draft to approved.
    1

    Every survey, with its status

    Surveys by opportunity and customer, with revision number and status from draft to approved.

  2. Sectioned survey form: Site, shaft, machine room, power, civil readiness and requirements, each checked off as it is completed.
    2

    Sectioned survey form

    Site, shaft, machine room, power, civil readiness and requirements, each checked off as it is completed.

  3. Dimensions feed the checks: An approved survey is checked against the chosen lift model, and mismatches are shown before engineering approves.
    3

    Dimensions feed the checks

    An approved survey is checked against the chosen lift model, and mismatches are shown before engineering approves.

How it helps

  • The same questions every time

    Every surveyor fills the same sections, so engineering gets complete measurements.

  • Revisions are kept

    Editing an approved survey starts a new revision; the approved one is never overwritten.

  • Photos with the measurements

    Site photos and drawings are attached to the survey itself, not lost in a phone gallery.

Compared with how it is usually done

Spreadsheets, Tally and general ERPs are good tools for what they were built for. This is where each one fits for this part of a lift business.

Site surveys compared with spreadsheets and paper, and with Tally or a general ERP
TaskExcel, paper and WhatsAppTally or a general ERPOopsWeSold
Record shaft, pit and headroomPaper form or sheet, photographed and sent on WhatsAppNo survey form; custom fields at bestStructured sections with required measurements
Engineering reviewPhone call and a marked-up PDFNot part of the productApprove or return with a note, recorded with who and when
Check the shaft fits the liftAn engineer compares by handNot availableSurvey checked against the model's approved limits

Other elevator software

  • Structured site survey with shaft, pit and headroom: claimed by 1 of the 7 elevator software websites we read.

Checked on 24 November 2026, from each vendor's own website. See the full comparison.

Who it is for

  • Surveyors and site engineers
  • Engineering managers who approve what gets quoted
  • Sales teams who need a trustworthy basis for the quotation

The problem

Survey notes arrive as photos and messages. Measurements are retyped, and engineering finds out about a headroom problem after the customer has a price.

How it works

  1. 1

    Assign

    Sales assigns a surveyor to the opportunity.

  2. 2

    Record

    The surveyor completes sections for the site, shaft, machine room, power, civil readiness and the customer's requirements, with a completion meter. Photos and drawings attach to the survey.

  3. 3

    Submit and review

    Engineering approves the survey or sends it back with a reason. Changes after review create a new revision.

  4. 4

    Use

    An approved survey is the only basis for a configuration. Its measurements are checked live against the product limits.

Site Survey · Hoistway Plumb & Clearance Gate
IS 17900 · IS 15259 · NBC 2016 Part 8Live rule engine · sample data · nothing saved

Try it: check a surveyed shaft

Enter clear finished RCC/masonry shaft readings (after plastering) and compare them against approved Indian lift series limits. Sales cannot push an incompatible configuration past engineering.

Test Indian site scenarios:
IS 17900 / NBC 20168 Persons · 544 kgSpeed: 1.0 m/sCar: 1300×1100 mmDoor: 800 mm
1,450 mm

Below bottom FFL · Model minimum: 1200 mm

4,150 mm

Top FFL to hoistway slab soffit · Minimum: 3800 mm

1,950 mm

Clear plumb width · Catalog GAD target: 1850 mm

1,750 mm

Clear plumb depth · Catalog GAD target: 1650 mm

Pit margin+250 mm
Overhead margin+350 mm
Clear width margin+100 mm
Clear depth margin+100 mm
The shaft suits this model.
Standard Indian civil checklist enforced alongside shaft dimensions: plumb tolerance within ±25 mm over travel, waterproofed dry pit, 2-ton rated overhead lifting hook in top RCC slab, 415V 3-phase isolator + dual independent copper earthing strips, and clear landing sill projection.

What you can do today

  • Sectioned, mobile-friendly form with revisions
  • Photo, drawing and document attachments
  • Engineering review with approve or return
  • Approved dimensions feed the configurator's checks

Controls and records

  • Review decisions are audited

Not available yet

So there are no surprises:

  • Offline survey capture on a phone
  • Measurement import from laser devices

Connected to

Questions

Can the surveyor work without a connection?

Not yet. The survey is a web form that needs a connection.